After Unit 6 of the Kozloduy Nuclear Power Plant was put into operation, a leak was ascertained in the coolant system of the electricity generator. Tests are being conducted to identify the cause of the problem, Minister of Energy in the caretaker government Rossen Hristov said for bTV.
“Until the leak is eliminated, the unit will remain disconnected from the national electric energy grid. There is no change in radiation levels. The problem is technical and it is in the non-nuclear part of the system. The reactor is in normal mode,” Minister Hristov said, and added that he hoped the deadline for completing the scheduled annual maintenance – 3 November - will be met.
'The dialogue between employers and trade unions has been restored. Consultations will begin tomorrow at the Ministry of Finance to iron out all the details. The state is committed to supporting every Bulgarian citizen.' This was written by GERB leader..
Bulgarian citizens traveled abroad 829,300 times in October, which is 15% more than in October 2024 , according to the National Statistical Institute. The most popular destinations were Turkey, Greece, Serbia, Romania, Germany, North Macedonia,..
The National Assembly has introduced a new requirement for state-owned enterprises to implement corruption risk management systems, which will also include appointing an integrity officer. The measure is recommended by the Organisation for Economic..
+359 2 9336 661