“Tell Bulgaria that it has not fulfilled its commitment connected with the infrastructure leading up to the border check points Deve Bair (at Kyustendil) and Klepalo (at Strumyani),” the Prime Minister of North Macedonia Dimitar Kovačevski said to the EU’s ambassador to North Macedonia David Geer at the opening of the 13-kilometre Kriva Palanka – Deve Bair road after rehabilitation. PM Kovačevski pointed out that the rehabilitation of the road from Kyustendil to the border was agreed on, with former Bulgarian Prime Minister Kiril Petkov, on his very first day as prime minister of North Macedonia. “At the time we agreed to have this road section repaired and to add a third lane,” Dimitar Kovačevski said, and promised the rehabilitation of the road to Stracin will continue, adding that work is underway to build a speedway from Rankovce to Kriva Palanka.
EUR 12.2 million has been granted by the EU for the rehabilitation and widening of the Kriva Palanka – Deve Bair road, as part of the EU grant for the construction of Corridor No. 8.
Judges have opposed the introduction of a new antivirus agent on their computers. The magistrates fear that it could violate personal data protection rules and compromise the independence of the judiciary. In an official letter, the Bulgarian..
GERB leader Boyko Borisov said in Parliament that Bulgaria will become a member of the eurozone on January 1, regardless of protests organized by representatives of We Continue the Change Democratic Bulgaria (PP-DB). He was commenting on opposition..
Six countries, including Bulgaria, are at risk of non compliance with the EU fiscal framework in 2026. This is highlighted in the 2026 European Semester Autumn Package, adopted by the European Commission. Another 12 countries are urged to continue..
+359 2 9336 661