Minister of Energy Rosen Hristov has expressed confidence that the gas interconnector Bulgaria-Serbia will be completed on time and within the budget frame. Today, he inspected the construction activities at the facility with an annual capacity of 1.8 billion cubic meters, which should be operational in October this year.
Currently, together with eight European countries, an analysis of the gas market in South-Eastern and Central Europe is being carried out in order for other countries to diversify their gas supplies, the way Bulgaria has done, the minister added. According to him, Bulgaria is ready to build an additional compressor station to increase capacity to 3.2 billion cubic meters.
On Wednesday , the lowest temperatures will be between 3 and 8°C. In the regions with strong wind it will be up to 10-12°C. In Sofia it will be around 4°C. In the western parts of the Danube Plain and the Upper Thracian Plain it will..
Following a series of fires in the Burgas area last summer, including one that destroyed homes in a local villa district, the Burgas municipality has acquired high-tech drones equipped with thermal cameras, night vision, and 3D imaging . The two..
Illegal migrants from Syria, Iraq and Iran have been discovered in Sofia, and ten members of an organised criminal group have been arrested , Deputy City Prosecutor Desislava Petrova told reporters. Two of those arrested have been charged as the..
+359 2 9336 661