Minister of Energy Rosen Hristov has expressed confidence that the gas interconnector Bulgaria-Serbia will be completed on time and within the budget frame. Today, he inspected the construction activities at the facility with an annual capacity of 1.8 billion cubic meters, which should be operational in October this year.
Currently, together with eight European countries, an analysis of the gas market in South-Eastern and Central Europe is being carried out in order for other countries to diversify their gas supplies, the way Bulgaria has done, the minister added. According to him, Bulgaria is ready to build an additional compressor station to increase capacity to 3.2 billion cubic meters.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661